Precautions
Play a luminous paint performance, must be complete and correct construction. The following are considerations on construction:
(1) understand the performance of the luminous pigment required luminous paint method of construction: the case of professional construction time: We recommend spraying a polymer coated agents on the ground floor to the second floor and the completion of the film, so can enhance adhesion, weather resistance and paint life.
(2) to do a complete surface treatment: Surface treatment of the appropriate or not, has a great influence on the performance and life of the film, it is necessary to completely remove the rust, grease, and other foreign matter to be constructed and fully dried after brushing.
(3) luminous paint should stir: pigment, resin mixture of liquid and luminous luminous paint department, from manufacture to use, there may be a period of time, and it is inevitable that the separation and precipitation pigment, or luminous of, so before use should stir.
(4) once the brush thickness should not be too thick: driveway stone once when the thickness of the brush if too thick, prone to diarrhea flow, wrinkles and other phenomena. So do proper control, multi-layered coating to do construction.
(5) should be lower laminate coating paint dry before construction: do the laminated coating, the paint is not dry when the following layers, it is prone to wrinkling occurs even infiltrating the underlying paint peeling. It should be lower to the upper layer of paint applied after the paint dry.
(6) at low temperatures and wet weather to avoid construction: When the temperature drops below 5 ℃, will reduce the paint to dry extreme, while in humidity over 85RH%, will produce nebula fog, dimmer, and even affect adhesion, and should therefore be avoid construction in such cases.
(7) try to remove dust: dust will not only affect film properties, can also damage the appearance, so clear and clean as possible.
(8) angle iron screws, plus Tu link at work should be done: at the angle iron links, welding or screws and other parts, easy to do because they do not complete the construction, plus painted the work should be done to make up for, Photoluminescent Tape and pay attention to avoid holidays, brushing unequal circumstances occur.
(9) the amount of attention Thinner driers shall be arbitrarily added: paint as too strong, when adding Thinner need to pay attention to the amount of its allocation, shall not affect the opacity and the film thickness, the general situation is not more than 5% in principle. Although they driers can promote drying of the paint, but excessive driers easily lead to quit phenomenon is dry inside, while leaving the film after drying to continue to promote the film of aging.
(10) Fast Drying: heated drying 65 ℃ ± 5 ℃, drying time is about 6-10 minutes.